Pages

Search This Website

Jan 21, 2022

Solar Rooftop Yojana Agency List In Gujarat- Pdf Download

 Solar Rooftop Yojana Agency List In Gujarat- Pdf Download

Solar rooftop Yojana Agency List In gujarat - Pdf Download: In a major initiative, Govt.. of India, under the National Solar Mission has set a target of 1,00,000 MW power generation through solar energy in the country including 40,000 MW to be contributed through Solar Rooftop in various sectors. Latest News, jobs Updates, Technology Tips and General Information Updates, remain with us kamalking Please share with your companions this Post.


In order to achieve this magnitude of capacity, Gujarat has been given the target of 8,024 MW Capacity of Solar Energy by 2021-22, out of which 3,200 MW is to be contributed by the rooftop segment.

Installation of Rooftop Solar Plants on a large scale is one of the best initiatives, as in such plants, there is no requirement of land. Energy is consumed where it is generated; there would be no element of transmission loss or wheeling loss and such plants would be in the interest of the public at large as well as State Utilities. Therefore, with a view of promoting large-scale rooftop solar systems on private residential roofs-terraces, the Government has introduced a subsidy scheme for solar rooftops in the residential sector.

This Scheme shall be called “SURYA-Gujarat” (Surya Urja Rooftop Yojana-Gujarat) with the following provisions:

Target: The target for installations of solar rooftops shall be to cater to 2 lac consumers during the year 2019-20 and cumulatively 8 lac consumers by the end of the financial year 2021-22.

The system cost mentioned in above table is inclusive of supply, installation, commissioning, comprehensive maintenance contract of 5 years of the complete solar system, bi-directional meter and its testing charges, SMC box for the meter and the connectivity charges to be paid to the DISCOM and standard structure required to install solar PV panel on the rooftop, with minimum surface clearance of 300 mm between the terrace surface and the bottommost edge of the panel. The cost of additional height of the structure required, if any, shall be borne by the beneficiary.

Any other charges to be paid to DISCOM , on account of requirement of change of phase if any from single to three phase, upgradation of the existing electricity distribution network, shall be borne additionally by the beneficiary, as it is not included in the discovered cost referred in the table above.

If the Applicant is a single phase consumer of the DISCOM and intends to install a Solar Roof Top System having capacity which necessitates to change the phase of his existing service connection from single phase to three phase, in such case the requisite charges for enhancement of the phase from single to three phase shall be borne by the consumer being part of the system strengthening, and not included in the discovered cost per kW

Salient Features of scheme for Residential Rooftop Solar Projects – 2018 -19

Scheme will be under implementation up to 31 st March, 2019

Residential consumer of any DISCOM, who is having residential property in his name,

is eligible to install solar PV system on his rooftop from any one supplier selected by

him from the list of GEDA Empaneled Vendors. List of these vendors is available on

GEDA web site www.geda.gujarat.gov.in

Beneficiary shall register their application through any of the GEDA registered

Approved empaneled vendor only.

Solar system should be minimum of 1 kW capacity.

Beneficiary should have 100 sq.ft. shadow free area per kilowatt capacity of solar

System on their rooftop.

Cost of the various capacity Solar Rooftop PV system discovered are as below;

Salient Features of scheme for Residential Rooftop Solar Projects – 2018 -19

IMPORTANT LINKS::

SOLAR ROOFTOP AGENCY LIST


▼☞ READ THIS OFFICIAL NEWS IN GUJARATI

▼☞ READ THIS NEWS IN GUJARATI

For Best View Please Open This Website In CHROME / OPERA Browser

No comments:

Post a Comment